Skip to content
Open Data Finder

Search results for scen

FiltersData.NSW

187 datasets for “scen”

  1. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Report

    Blacktown City CouncilUpdated 17 Dec 2025

    Report and Figures

  2. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Dataset Handover Description

    Blacktown City CouncilUpdated 17 Dec 2025

    Dataset Handover Description

  3. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Post-Processed Layers

    Blacktown City CouncilUpdated 17 Dec 2025

    Post-Processed TUFLOW Results

  4. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Hydraulic Model Inputs (TUFLOW)

    Blacktown City CouncilUpdated 17 Dec 2025

    Hydraulic Model Inputs (TUFLOW)

  5. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Hydraulic Model Outputs (TUFLOW)

    Blacktown City CouncilUpdated 17 Dec 2025

    Hydraulic Model Outputs (TUFLOW)

  6. Data.NSW

    Barham FRMSP - Levee Scenarios

    Murray River CouncilUpdated 17 Dec 2025

    Scenario 1 - assumes levee breaches Scenario 2 - assumes levee remains intact

  7. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Hydrological Model Inputs (XP-RAFTS)

    Blacktown City CouncilUpdated 17 Dec 2025

    Hydrological Model Inputs (XP-RAFTS)

  8. Data.NSW

    Eastern Creek Catchment - Development Scenario Hydraulic Assessment - Hydrological Model Outputs (XP-RAFTS)

    Blacktown City CouncilUpdated 17 Dec 2025

    Hydrological Model Outputs (XP-RAFTS)

  9. Data.NSW

    Environmental Planning Instrument - Scenic Protection

    NSW Department of Planning, Housing and InfrastructureUpdated 1 Oct 2026

    This spatial dataset identifies the land where development implications exist to reduce visual impacts in scenic areas, as …

    • PDF
    • WMS
    • ARCGIS REST SERVICE
    • WFS
    • TXT
    • JSON
  10. Data.NSW

    Management options and scenarios to generate ESFM targets for the Eden RFA (Project Area 5)

    NSW Department of Planning, Housing and InfrastructureUpdated 5 Nov 2026

    Environmental Impact Statement: Management options and scenarios to generate ESFM targets for the Eden RFA (Project Area 5)

    • PDF
  11. Data.NSW

    Murray Downs FRMSP - Levee Scenarios

    Murray River CouncilUpdated 17 Dec 2025

    Breached levee conditions and levee intact conditions

  12. Data.NSW

    Tweed Valley Additional Climate Change Scenario - Report

    Tweed Shire CouncilUpdated 17 Dec 2025

    Letter format, including maps

  13. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 6–Combination

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    Combination of the extended resumption of flow rule inclusive of additional trigger sites, end of system flow target …

    • PDF
    • XLSX
  14. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 5–Connectivity EWA–Bourke Flow Trigger

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    Replenishment releases are triggered by a continuous period of low flow at Bourke. Up to one smaller release …

    • PDF
    • XLSX
  15. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 3–Extended Resumption of Flow

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    Flow rates for imposing restrictions have been set at below baseflow for 90 consecutive days at trigger sites …

    • PDF
    • XLSX
  16. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 1–End of System–High Security Accounts

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    Set an end of system flow target (equivalent to the bottom of baseflow) in regulated valleys (Gwydir, Namoi …

    • PDF
    • XLSX
  17. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 4–Connectivity EWA–Dam Inflow Trigger

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    The Panel recommended that the Gwydir, Namoi and NSW Border Rivers regulated water sharing plans should include a …

    • PDF
    • XLSX
  18. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 2–End of System–Translucency

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 3 Oct 2026

    Set an end of system flow target (equivalent to the bottom of baseflow) in regulated valleys (Gwydir, Namoi …

    • PDF
    • XLSX
  19. Data.NSW

    Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025

    NSW Department of Climate Change, Energy, the Environment and WaterUpdated 2 Oct 2026

    Hydrologic modelling assessment of the Connectivity Expert Panel recommendations (Hydrologic Modelling Scenarios) The Connectivity Expert Panel recommended objectives …

    • PDF
  20. Data.NSW

    Griffith Aerodrome Overland Flow Floodplain Risk Management Study and Plan - REPORT

    Griffith City CouncilUpdated 15 Jan 2026

    The Griffith Aerodrome Floodplain Risk Management Plan has been prepared in accordance with the NSW Floodplain Development Manual …

“scen” datasets · Open Data Finder