What’s new
What’s new in open data
Datasets that public data portals just published, updated or stopped listing. Dates are the portals’ own catalog dates; our copy of the catalogs was refreshed 14 Nov 2026, 03:56 UTC.
- 8,518new datasets in the 7 days to 14 Nov 2026
- 186,290updated datasets in the 7 days to 14 Nov 2026
- 0no longer listed
Datasets published per day, last 30 days
Across every catalog we index, by each portal’s own creation date. The last day may be incomplete.
FiltersData.NSW
Published · Data.NSW, newest first
RSS feed- Data.NSW
Cowra Overland Flood Study and Plan - Model Input (DRAINS)
Cowra Shire CouncilPublished 17 Dec 2025
Fitzroy Street
- Data.NSW
Cowra Overland Flood Study and Plan - Rainfall
Cowra Shire CouncilPublished 17 Dec 2025
Daily Rainfall for Cowra
- Data.NSW
Cowra Overland Flood Study and Plan - Orthos
Cowra Shire CouncilPublished 17 Dec 2025
TIF format
- Data.NSW
Cowra Overland Flood Study and Plan - GIS
Cowra Shire CouncilPublished 17 Dec 2025
Includes catchments
- Data.NSW
Cowra Overland Flood Study and Plan - Aerial
Cowra Shire CouncilPublished 17 Dec 2025
Fitzroy St
- Data.NSW
Coogee Bay Floodplain Risk Management Study & Plan
Randwick City CouncilPublished 17 Dec 2025
Coogee Bay Floodplain Risk Management Study & Plan - Final Report
- Data.NSW
Little Creek Catchment Floodplain Risk Management Study and Plan - Reports
Penrith City CouncilPublished 17 Dec 2025
Final Little Creek Floodplain Risk Management Study and Plan reports in PDF format.
- Data.NSW
Gloucester and Avon River Flood Study - Flood extents
Mid-Coast CouncilPublished 17 Dec 2025
The Gloucester and Avon Rivers Flood Study has been prepared for Gloucester Shire Council (Council) to define the existing flood behaviour in the catchment and establish the basis for subsequent floodplain management activities. This projec …
- Data.NSW
Report & Figures
Wingecarribee Shire CouncilPublished 17 Dec 2025
Volume 1 (report text) and Volume 2 (figures)
- Data.NSW
Macquarie Rivulet Flood Study - Spatial - Enveloped Grids
Shellharbour City CouncilPublished 17 Dec 2025
Calibration and design
- Data.NSW
Flood Project Handover Template - NSW Flood Data Portal
Hawkesbury City CouncilPublished 17 Dec 2025
Flood Project Handover Template - NSW Flood Data Portal
- Data.NSW
Lowering of Gurungaty Causeway Concept Design Report - Cost Estimate
Wollongong City CouncilPublished 17 Dec 2025
Engineering cost estimate
- Data.NSW
Lowering of Gurungaty Causeway Concept Design Report - Design Drawings
Wollongong City CouncilPublished 17 Dec 2025
Design drawings
- Data.NSW
Lowering of Gurungaty Causeway Concept Design Report - Appendices
Wollongong City CouncilPublished 17 Dec 2025
A, B, C
- Data.NSW
Mol_FRMS&P_Reports
Cabonne Shire CouncilPublished 17 Dec 2025
Molong Flood Risk Management Study and Plan - Reports
- Data.NSW
Bullaburra to Linden Floodplain Risk Management Study and Plan - spatial layers
Blue Mountains City CouncilPublished 17 Dec 2025
Bullaburra to Linden Flood Planning Area
- Data.NSW
Alipou Creek Flood Study - Report
Clarence Valley CouncilPublished 17 Dec 2025
Complete report
- Data.NSW
Sailors Bay Creek Flood Study - Volume 1 - Report
Willoughby City CouncilPublished 17 Dec 2025
This report presents the results of an investigation of flooding in the Sailors Bay Creek catchment and has been jointly sponsored by Willoughby City Council (WCC) and the NSW Government, via the Office of Environment and Heritage (OEH). Fi …
- Data.NSW
Blackmans Swamp Creek - Flood Study - Hydrologic Model Output
Orange City CouncilPublished 17 Dec 2025
XP-RAFTS
- Data.NSW
Blackmans Swamp Creek - Flood Study - GIS
Orange City CouncilPublished 17 Dec 2025
Miscellaneous GIS spatial layers
- Data.NSW
Blackmans Swamp Creek - Flood Study - Report
Orange City CouncilPublished 17 Dec 2025
Volume 1 & 2
- Data.NSW
Currambene and Moona Moona Creeks Floodplain Risk Management Study and Plan
Shoalhaven City CouncilPublished 17 Dec 2025
__1. INTRODUCTION AND BACKGROUND__ This Study has been prepared by WMAwater on behalf of the Shoalhaven City Council (Council). The Study is composed of three phases: 1. Revision of the 2006 Currambene Creek and Moona Moona Creek Flood Stud …
- Data.NSW
Camden Haven Floodplain Risk Management Plan - Report
Port Macquarie-Hastings CouncilPublished 17 Dec 2025
Complete report
- Data.NSW
Gibbergunyah Creek Flood Study
Wingecarribee Shire CouncilPublished 17 Dec 2025
The __Flood Study__ comprises two volumes: * __Volume 1__ comprises the report text and appendices * __Volume 2__ contains all accompanying report figures. #Objectives The objectives of the Gibbergunyah Creek Flood Study are: * to review av …
- Data.NSW
Sugarloaf Creek Flood Study
Willoughby City CouncilPublished 17 Dec 2025
The study objective was to define flood behaviour on Sugarloaf Creek in terms of water levels, flows and velocities for design floods ranging between 5 and 100 year ARI, as well as for the Probable Maximum Flood (PMF). Figure 1.1 shows the …