What’s new
What’s new in open data
Datasets that public data portals just published, updated or stopped listing. Dates are the portals’ own catalog dates; our copy of the catalogs was refreshed 14 Nov 2026, 03:56 UTC.
- 8,518new datasets in the 7 days to 14 Nov 2026
- 186,290updated datasets in the 7 days to 14 Nov 2026
- 0no longer listed
Datasets published per day, last 30 days
Across every catalog we index, by each portal’s own creation date. The last day may be incomplete.
FiltersData.NSW
Published · Data.NSW, newest first
RSS feed- Data.NSW
Cooks River Catchment Flood Study
Canterbury-Bankstown CouncilPublished 17 Dec 2025
BMT WBM was commissioned by Bankstown City Council to prepare a Flood Study for the Cooks River stormwater catchment. Similar studies were simultaneously commissioned for the Punchbowl, the Georges Hall, the Lansdowne and the Miller Road st …
- Data.NSW
Wallarah Creek Catchment Flood Study - Final Report
Central Coast CouncilPublished 17 Dec 2025
Report is two parts: * VOLUME 1: Report and Appendices; VOLUME 2: Figures;
- Data.NSW
Gwawley Bay Catchment Flood Study
Sutherland Shire CouncilPublished 17 Dec 2025
The study investigates flood behaviour throughout the Gwawley Bay catchment. This includes the analysis of: 1. surface runoff across the catchment 2. flows within the underground pipe drainage network 3. flooding within Gwawley Creek and ot …
- Data.NSW
Lower Ourimbah Creek Floodplain Risk Management Study Review and Plan
Central Coast CouncilPublished 17 Dec 2025
The primary objective of the Lower Ourimbah Creek Floodplain Risk Management Study Review is to determine appropriate floodplain management measures for the preparation of a cost-effective Floodplain Risk Management Plan for the study area. …
- Data.NSW
Nattai River Flood Study
Wingecarribee Shire CouncilPublished 17 Dec 2025
Wingecarribee Shire Council engaged Catchment Simulations Solutions to prepare a Flood Study for the Nattai River catchment. The extent of the catchment is shown in Figure 1 in report (refer Flood Study: Volume 2). The objectives of the Nat …
- Data.NSW
Lower Shoalhaven River Floodplain Risk Management Plan
Shoalhaven City CouncilPublished 17 Dec 2025
__INTRODUCTION__ The Shoalhaven River catchment covers an area of some 7000 square kilometres with approximately 120 square kilometres of floodplain downstream of Nowra (Figure 1). The river rises approximately 50km inland of Moruya and fol …
- Data.NSW
Picnic Point Catchment Flood Study
Canterbury-Bankstown CouncilPublished 17 Dec 2025
#Study Area The study area is located in south west Sydney and includes the central part of the suburb of Picnic Point. The northern part of the catchment is predominantly urban; the southern part includes parts of the Georges River Nationa …
- Data.NSW
Georges Hall Catchment Flood Study
Canterbury-Bankstown CouncilPublished 17 Dec 2025
#The Study Area The Georges Hall study area is located in Bankstown, south west Sydney and is contained within the suburb of Georges Hall. The Georges Hall catchment area is approximately 140 hectares of predominantly residential land. Elev …
- Data.NSW
Greenacre Park Stormwater Catchment Flood Study
Canterbury-Bankstown CouncilPublished 17 Dec 2025
#Study Area The study area is known as the Greenacre Park catchment. It is one of four catchment areas that drain to the Upper Cooks River, which flows to Botany Bay through the Cooks River. The study area is located mostly within the Sydne …
- Data.NSW
Narrandera Levee - Levee Structural Integrity Report
Narrandera Shire CouncilPublished 17 Dec 2025
A structural assessment of the southern bank of the Murrumbidgee Irrigation Canal, acting as a levee providing protection to Narrandera has been undertaken. Due to the great age and level of deterioration of the embankment, a risk-based ass …
- Data.NSW
TUFLOW Hydraulic model input files
Hawkesbury City CouncilPublished 17 Dec 2025
TUFLOW control and input files for all design event simulations. See "TUFLOW_modelling_log.xlsx" describing simulated event/scenario combinations.
- Data.NSW
Final report Redbank Creek Flood Study
Hawkesbury City CouncilPublished 17 Dec 2025
The final report provides a comprehensive summary of the project's objectives, data collection and review, methodology, key flood modelling results, consequences of flooding on the community and conclusions.
- Data.NSW
Leeton Flood Study Review - Final Report
Leeton Shire CouncilPublished 17 Dec 2025
Leeton Flood Study Review Report includes the main report and all appendices.
- Data.NSW
Murrumbidgee Irrigation Canal Levee - Seepage and Stability Analysis
Narrandera Shire CouncilPublished 17 Dec 2025
This report has been prepared by the Dams Section of Infrastructure Services - Public Works Advisory (PWA) and presents the findings of a desktop seepage and stability analysis for the Murrumbidgee Irrigation Canal Levee.
- Data.NSW
Turo Creek, Pretty Beach Floodplain Risk Management Study
Central Coast CouncilPublished 17 Dec 2025
This Floodplain Risk Management Study (FRMS) for Turo Creek, Pretty Beach, has been undertaken by Cardno Lawson Treloar for Gosford City Council to identify, assess and compare various options for the management of flood risk within the Tur …
- Data.NSW
Tabourie Lake Flood Study
Shoalhaven City CouncilPublished 17 Dec 2025
__INTRODUCTION__ The Tabourie Lake Flood Study has been prepared for Shoalhaven City Council (Council) to define the existing flood behaviour in the Tabourie Lake catchment and establish the basis for subsequent floodplain management activi …
- Data.NSW
Narrandera Voluntary Purchase and House Raising – Feasibility Study
Narrandera Shire CouncilPublished 17 Dec 2025
Narrandera Shire Council has engaged Water Modelling Solutions (WMS) to carry out a detailed feasibility study of a Voluntary House Purchase (VHP) Scheme and Voluntary House Raising (VHR) Scheme in Narrandera. The preparation of this study …
- Data.NSW
Processed output files
Hawkesbury City CouncilPublished 17 Dec 2025
Processed output files include : - Peak enveloped and filtered level, depth, and velocity for a range of events from the 20% to 1 in 5000 AEP events and PMF as well as 2040, 2090 and 2100 climate change scenarios. See "READ ME.txt" for desc …
- Data.NSW
Hydrological model input files
Hawkesbury City CouncilPublished 17 Dec 2025
Hydrological model input files for all design events.
- Data.NSW
Scone Floodplain Risk Management Study & Plan (Worley Consulting 2025) - SES Data Portal Contents
Upper Hunter Shire CouncilPublished 17 Dec 2025
SES Data Portal Contents
- Data.NSW
Narromine Flood Study - Final Report
Narromine Shire CouncilPublished 17 Dec 2025
The activities comprising the present investigation included: 1. Review of flooding patterns in the area presently covered by the model and preparation of a brief for additional cross sectional survey which would also cover areas earmarked …
- Data.NSW
Empire Bay Catchment Flood Study
Central Coast CouncilPublished 17 Dec 2025
Flood modelling of local catchment runoff was completed the Empire Bay catchment for a range of annual exceedance probabilities of storms from 100% AEP to 0.5% AEP and up to a PMF event. In a 1% AEP event, the modelling shows that some prop …
- Data.NSW
BCFS Reporting - Public Access
Shoalhaven City CouncilPublished 17 Dec 2025
Broughton Creek Flood Study Final Report
- Data.NSW
Kogarah Bay Creek Floodplain Risk Management Study
Georges River CouncilPublished 17 Dec 2025
Kogarah Bay Creek is a 2.8 km2 catchment which drains into Kogarah Bay forming part of the Georges River estuary feeding into Botany Bay (Figure 1). It is one of the largest catchments in the Kogarah Council municipality and has the greates …
- Data.NSW
Blackmans Swamp Creek Floodplain Risk Management Study and Plan - Report
Orange City CouncilPublished 17 Dec 2025
* Volume 1- Study report; * Volume 2- Appendices