Long Term Development Statement (LTDS) Table 3b True Peak Demand

Published by UK Power Networks, Company number 3870728

About this dataset

Introduction The Long Term Development Statements (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year. This is Table 3b from our current LTDS report (published 29th May 2026), showing the true substation peak demands with correction added for demand served by generation. More information and full reports are available from the landing page below: Long Term Development Statement Landing Page Methodological Approach Site Functional Locations (FLOCs) are used to associate the From Substation to Grid and Primary Sites ID field added to identify row number for reference purposes Quality Control Statement Quality Control Measures include: Verification steps to match features only with confirmed functional locations. Manual review and correction of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency. Other Download dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal Glossary To view this data please register and login.

Live preview

The first rows, fetched from Opendatasoft hub when you open this page.

Loading the first rows from the source…

Long Term Development Statement (LTDS) Table 3b True Peak Demand · Open Data Finder