Skip to content
Open Data Finder
Opendatasoft hubLive preview

Curtailment Events Site Specific

Published by UK Power Networks, Company number 3870728

About this dataset

Introduction When a generation customer requests a firm connection under a congested part of our network, there may be a requirement to reinforce the network to accommodate the connection. The reinforcement works take time to complete which increases the lead time to connect for the customer. Furthermore, the customer may need to contribute to the cost of the reinforcement works. UK Power Networks offers curtailable-connections as an alternative solution for our customers. It allows customers to connect to the distribution network as soon as possible rather than waiting, and potentially paying, for network reinforcement. This is possible because under a curtailable connection, the customer agrees that their access to the network can be controlled when congestion is high. These fast-tracked curtailable-connections can transition to firm connections once the reinforcement activity has taken place. Curtailable connections have enabled faster and cheaper connection of renewable energy generation to the distribution network owned and operated by UK Power Networks. The Distribution System Operator (DSO) team has developed the Distributed Energy Resource Management System (DERMS) that monitors curtailable-connection generators as well as associated constraints on the network. When a constraint reaches a critical threshold, an export access reduction signal may be sent to generators associated with that constraint so that the network can be kept safe, secure, and reliable. This dataset contains a record of curtailment events and the associated access reduction experienced by DERs with curtailable connections. Access reduction is calculated as the MW access reduction from maximum × duration of access reduction in hours (MW×h). The dataset categorises curtailment actions into two categories: Constraint-driven curtailment: when a constraint is breached, we aggregate the access reduction of all customers associated with that constraint. A constraint breach occurs when the network load exceeds the safe limit; and Non-constraint driven curtailment: this covers all curtailment which is not directly related to a constraint breach on the network. It includes customer comms failures, non-compliance trips (where the customer has not complied with a curtailment instruction), planned outages, and unplanned outages. Each row in the dataset is a curtailment event, meaning a continuous period of access reduction, with associated start and end times, volume of access reduction, estimated energy reduction, and likely curtailment driver. We also provide the associated grid supply point (GSP) and nominal voltage to provide greater aggregation capabilities. Estimated energy loss is calculated using the average generation of the specific asset from the five most recent non-curtailment weekdays or the two most recent non-curtailment weekend days, depending on whether the curtailment event occurred on a weekday or a weekend. The curtailment driver column represents UK Power Networks' best view of the likely driver of the curtailment. Future improvements may remap drivers and provide a more detailed breakdown of drivers. By virtue of being able to track curtailment across our network in granular detail, we have managed to significantly reduce curtailment of our curtailable-connections customers. Methodological Approach A Remote Terminal Unit (RTU) is installed at each curtailable-connection site providing live telemetry data into the DERMS. It measures communications status, generator output, and mode of operation. RTUs are also installed at constraint locations (physical parts of the network, e.g., transformers, cables which may become overloaded under certain conditions). These are identified through planning power load studies. These RTUs monitor current at the constraint and communications status. The DERMS design integrates network topology information. This maps constraints to associated curtailable connections under different network running conditions

Live preview

The first rows, fetched from Opendatasoft hub when you open this page.

Loading the first rows from the source…

Curtailment Events Site Specific · Open Data Finder