Skip to content
Open Data Finder
Opendatasoft hubLive preview

Constraint Breaches History

Published by UK Power Networks, Company number 3870728

About this dataset

Introduction This dataset records all curtailment events experienced by curtailable-connection customers. About Curtailment When a generation customer requests a firm connection under a congested part of our network, there may be a requirement to reinforce the network to accommodate the connection. The reinforcement works take time to complete which increases the lead time to connect for the customer. Furthermore, the customer may need to contribute to the cost of the reinforcement works. UK Power Networks offers curtailable-connections as an alternative solution for our customers. It allows customers to connect to the distribution network as soon as possible rather than waiting, and potentially paying, for network reinforcement. This is possible because under a curtailable connection, the customer agrees that their access to the network can be controlled when congestion is high. These fast-tracked curtailable-connections can transition to firm connections once the reinforcement activity has taken place. Curtailable connections have enabled faster and cheaper connection of renewable energy generation to the distribution network owned and operated by UK Power Networks. The Distribution System Operator (DSO) team has developed the Distributed Energy Resource Management System (DERMS) that monitors curtailable-connection generators as well as associated constraints on the network. When a constraint reaches a critical threshold, an export access reduction signal may be sent to generators associated with that constraint so that the network can be kept safe, secure, and reliable. This dataset contains a record of curtailment actions we have taken and the resultant access reduction experienced by our curtailment-connections customers. Access reduction is calculated as the MW access reduction from maximum × duration of access reduction in hours (MW×h). The dataset categorises curtailment actions into 2 categories: Constraint-driven curtailment: when a constraint is breached, we aggregate the access reduction of all customers associated with that constraint. A constraint breach occurs when the network load exceeds the safe limit. Non-constraint driven curtailment: this covers all curtailment which is not directly related to a constraint breach on the network. It includes customer comms failures, non-compliance trips (where the customer has not complied with a curtailment instruction), planned outages and unplanned outages Each row in the dataset details the start and end times, durations and customer access reduction associated with a curtailment actions. We also provide the associated grid supply point (GSP) and nominal voltage to provide greater aggregation capabilities. By virtue of being able to track curtailment across our network in granular detail, we have managed to significantly reduce curtailment of our curtailable-connections customers. Methodological Approach A Remote Terminal Unit (RTU) is installed at each curtailable-connection site providing live telemetry data into the DERMS. It measures communications status, generator output and mode of operation. RTUs are also installed at constraint locations (physical parts of the network, e.g., transformers, cables which may become overloaded under certain conditions). These are identified through planning power load studies. These RTUs monitor current at the constraint and communications status. The DERMS design integrates network topology information. This maps constraints to associated curtailable connections under different network running conditions, including the sensitivity of the constraints to each curtailable connection. In general, a 1MW reduction in generation of a customer will cause <1MW reduction at the constraint. Each constraint is registered to a GSP. DERMS monitors constraints against the associated breach limit. When a constraint limit is breached, DERMS calculates the amount of access reduction required from curtailable connections linked to the constraint to

Live preview

The first rows, fetched from Opendatasoft hub when you open this page.

Loading the first rows from the source…

Constraint Breaches History · Open Data Finder