Appendix G Site Specific Conditions
Published by UK Power Networks, Company number 3870728
About this dataset
Introduction Following an ESO (Electricity System Operator) and NGET (National Grid Electricity Transmission) assessment, some GSPs (Grid Supply Points) may be identified as having a need to place technical requirements or protection schemes on their generation. Methodological Approach Data is compiled from existing datashare between UK Power Networks and the National Energy System Operator. Quality Control Statement Quality Control Measures include: Manual review and correct of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and DSO Regional Development Team worked together ensure data accuracy and consistency. Other Download dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: https://ukpowernetworks.opendatasoft.com/pages/glossary/ To view this data please register and login.
Live preview
The first rows, fetched from Opendatasoft hub when you open this page.
Loading the first rows from the source…