Skip to content
Open Data Finder
data.gov.au

Notes on the surveying of drill holes

Published by Geoscience Australia Data

About this dataset

In drill hole surveying the azimuth and depression angles of the hole are measured at a series of points. To calculate the course of the hole from these measurements it is often assumed that the measurements are representative of the complete interval separating the half-way points between measurements. This Record describes a method of calculation in which the continuous variation of the course of the hole is taken into account. It gives a practical example of the application of this method, and compares the results with those obtained by the simpler method. Notes are given on the accuracy of surveys.

Notes on the surveying of drill holes · Open Data Finder