Murray Basin Hydrogeological project : progress report 13 for half year ending 31 March 1985
Published by Geoscience Australia Data
About this dataset
At Bureau of Mineral Resources, Project staff concerned with the geological phase have devoted much effort to checking and editing bore hole stratigraphic data and in compiling a report on the subsurface stratigraphic database; these tasks have proceeded in parallel with the computer-assisted drawing of structure contour maps of stratigraphic units and aquifers. The cartographic work, together with the writing of a text on the geology of the Basin, is continuing. A preliminary edition of a 1:1 million scale Cainozoic geology map of the Basin was published in February. Work on the hydrogeological aspects of the Project continued with the compilation of data from four 1/4 million scale map sheets, and some water sampling in previously little known areas.