Manly Lagoon Flood Study
Published by Northern Beaches Council
About this dataset
Conclusions Provided below is a summary of the key findings of the Flood Study, in particular some of the important considerations for future floodplain risk management in the catchment: The design flood conditions documented in the report typically provide for a small increase in previously adopted design flood conditions for Manly Lagoon. The main contributing factor to this change is the way the entrance condition has been modelled. In addition to advances in the software to simulate entrance breakout response, the initial conditions in respect to berm elevations and initial water levels in the Lagoon have been represented in the model according to current Council entrance management practices. Longer duration events (6-9 hours) typically provide for the worst case flooding conditions in Manly Lagoon. With the Lagoon water body providing flood storage, events of longer duration are required to generate sufficient flood runoff volumes from the catchment to elevate Lagoon water levels. In the lower reaches of all the tributary catchments, flood levels are dominated by the Lagoon flooding conditions. The peak flood water level in the Lagoon extends a significant distance up the tributary channels. In the upper reaches of the tributary catchments, shorter duration events of the order of 2-hours provide the critical flood condition in terms of peak flood water level. The rise in flood water levels can be relatively fast from the catchment’s response to rainfall. Even for the longer duration events providing for the highest peak flood water levels in the Lagoon, the main period of rise in Lagoon water level can occur over a few hours. The April 1998 flood event (used for model calibration in the current study) is an example of such a response in the catchment. Flood levels in the tributary catchments may also rise significantly faster owing to the shorter critical durations in these catchments. This potentially rapid inundation has implications for flood warning and emergency response, particularly in flood situations where property and access roads may be quickly inundated. Catchment derived flooding events represent the dominant flooding mechanism in Manly Lagoon. Whilst some ocean flooding scenarios will provide for inundation of some foreshore areas, the extent and severity of flooding is significantly less than the corresponding catchment derived event magnitude. The entrance condition has some influence on catchment flood behaviour with higher entrance berm levels providing for higher peak flood levels. The existing entrance management policy provides for manual breakout of the Lagoon entrance at defined trigger levels in preparation for imminent flooding. Irrespective of the successful implementation of a manual entrance breakout, significant flood inundation may be expected during major catchment flood events. There are a number of areas within the Manly Lagoon catchment which represent the most significant flood risk exposure to existing property. The worst affected areas are typically in the lower parts of the catchment and most severely impacted on by major flooding in Manly Lagoon. These areas include the foreshore areas of the Lagoon around Riverview Parade. Much of the lower floodplain area is however occupied by park lands / golf courses such that flood risk exposure of existing property is limited. Elsewhere, the Warringah Mall and Balgowlah Industrial Estate are located on the alignments of Brookvale Creek and Burnt Bridge Creek respectively. When drainage system capacities in these areas are exceeded, there is potential for overland flow through these areas: Peak design flood water levels are expected to progressively increase as the impacts of climate change manifest. For the Manly Lagoon catchment, potential sea level rise will provide for a worsening of existing flood conditions through higher ocean water levels (tide and storm surge), higher entrance berm and higher initial water levels in the Lagoon. Robust