Queensland Government Open Data
EPM28108 YATTON FINAL REPORT FOR PERIOD ENDING 18 APRIL 2024
Published by Geological Survey of Queensland
About this dataset
URL: https://geoscience.data.qld.gov.au/dataset/cr146395 EPM 28108, Final report for the period 7 February 2022 to 18 April 2024. A sampling trip was planned for April 2022 across several tenements, however landholder permissions for this tenement were not obtained in time. Instead, the sampling trip was conducted in April 2023, visiting U-Th radiometric anomalies. The assay results returned low level REE and rare metal enrichment, however assays were well below economic levels for a hard rock deposit. The exploration thesis is considered adequately tested and the tenement is recommended for relinquishment.