ATP 2021 Vali-1 ST1 Production Test Report Revision 0 25 Sept 2020
Published by Geological Survey of Queensland
About this dataset
URL: https://geoscience.data.qld.gov.au/dataset/cr120869 This report summarises production testing of Vali-1 ST1, that was conducted from 11 to 19 August 2020, post fracture stimulation and brief clean up flow. Stimulated sands within the Patchawarra Formation and Tirrawarra Sandstone were produced via a choke manifold and separator, with gas directed to flare and liquids produced to storage tanks prior to transfer to a temporary above ground lined evaporation pond. Testing consisted of MPLT (memory production log test), modified isochronal with 48 hour extended flow, 72 hour final build-up and static gradient survey. A reservoir fluid sampling program was conducted during the modified isochronal and extended flow periods. Test equipment was demobilised from site following completion of the test program (except the lined evaporation pond, to be recovered during subsequent operations).