Queensland Government Open Data
PL43 DENISON GAS (QUEENSLAND) PTY LTD YELLOWBANK 8 WELL COMPLETION REPORT
Published by Geological Survey of Queensland
About this dataset
URL: https://geoscience.data.qld.gov.au/dataset/cr127838 Yellowbank 8 was drilled in May 2021 as a vertical coal gas exploration well within the Denison Gas operated PL 43. The well is located north of the 2020 drilled Yellowbank 9 well which demonstrated permeability within the Bandanna Coal Measures B1 and B3 coal seams when tested by MDTs 1 and 2. The tenement is located within the Denison Trough sub-basin of the greater Bowen Basin in southeast Queensland. 8.30m of net coal was encountered within the Bandanna Coal Measures, primarily across the B1 and B3 target coals