Middle Creek, Pearl Beach Floodplain Risk Management Study
Published by Central Coast Council
About this dataset
Middle Creek is a small watercourse that drains through the village of Pearl Beach on the New South Wales Central Coast. The creek is an ephemeral stream that drains a 58.3 ha catchment that is mostly undeveloped and which extends back from the coast to the escarpment (__refer Figure 1__). Available anecdotal and recorded data indicates that flooding has occurred on many occasions, most notably in January 1989, April 1989, February 1990 and January 1992. This flooding was particularly severe in the vicinity of the Diamond Road crossing of the creek __(refer Figure 1)__ and led to significant damage to properties that adjoin the lower reaches of the creek. This and the ongoing risk has led to the development of a Floodplain management plan. The __“existing flood problem”__ relates to those areas of the existing floodplain where damages are likely to arise as a consequence of flooding. It concerns existing dwellings and properties that would be inundated during a flood, as well as all associated infrastructure within the floodplain, including roads and utility services. In this context, the “existing flood problem” is usually addressed by structural measures which aim to modify flood behaviour and thereby reduce flood damages. #FLOOD DAMAGES Data defining the floor levels of residential dwellings located along Middle Creek was provided by Gosford City Council. This data was used with peak flood levels generated from flood modelling to determine the depth of flooding in the vicinity of each building. This allowed the depth of ‘over floor’ flooding to be determined (if any). The flood affected dwellings along Middle Creek are identified in __Figure 4__. Estimates of the flood damages associated with each of the 200, 100, 50, 20, and 5 year recurrence floods and the Probable Maximum Flood (PMF) are listed in __Table 3__. The number of properties predicted to be inundated during each flood are also listed. All damage costs are expressed in 2007 dollars. #IMPLEMENTATION OF THE PLAN The following floodplain management strategies are recommended for implementation under this Floodplain Risk Management Plan. Further details of the actions associated with each strategy are provided in __Table 6__ 1. Construct two low level flood levees at the rear of properties between 10 and 16 Emerald Avenue, Pearl Beach. 2. Encourage landowners to establish a Rivercare group and seek assistance from the Natural Heritage Trust and Hunter-Central Rivers Catchment Management Authority to undertake creek corridor management activities. These activities would include vegetation management, bed and bank stabilisation works and small-scale works to increase channel conveyance. 3. Install a piped stormwater system along Pearl Beach Drive to reduce the magnitude of stormwater runoff carried by Middle Creek during large flood events. 4. Update Development Control Plan No.162 (Residential Development at Pearl Beach) to include additional flood related development controls for the Middle Creek floodplain __(refer Section 3.4.1)__, and incorporate changes into the new Citywide DCP. Strengthen all related existing Council planning and development controls. 5. Monitor the extent of landscaping and bed or bank stabilisation works within the Middle Creek floodplain in order to enforce the proposed requirements of the Gosford Citywide DCP. 6. Develop a formal Flood Emergency Response Plan for Middle Creek as a sub-plan to the Gosford City Displan (2005), which is to include details of the recommended flood evacuation route and flood refuge.