Canley Corridor Overland Flood Study
Published by Fairfield City Council
About this dataset
This report is structured as follows: ##Section 1 – Introduction ##Section 2 – Background: Explanation of the need for this overland flow study, of Fairfield’s overland flow study program, the situation of this study area, the study objectives, and the history of flooding in the catchment ##Section 3 – Available Data: Overview of the data collection process for this study ##Section 4 – Catchment and Stormwater Model Development: Explanation of the development of the different hydrological and stormwater modelling approaches used in this study ##Section 5 – Hydraulic Modelling: Background to the development of the two-dimensional hydraulic model used in this study ##Section 6 – Sensitivity of Hydrological Modelling: Evaluation of the different hydrological and stormwater modelling approaches and comparison of their results ##Section 7 – Flood Mapping Results: Use of the study modelling to derive flood extent mapping and flood risk precinct mapping ##Section 8 – Conclusions: Key conclusions from the study regarding modelling methodology and results. #Study Area The study area for Canley Corridor Overland Flood Study is located south west of Orphan School Creek, between the suburbs of Canley Vale and Canley Heights and Cabramatta. The Canley Corridor catchment has a north easterly aspect and drains overland into Orphan School Creek, which is the main tributary of Prospect Creek. The 258 hectare catchment has a range of land uses including residential, commercial and light industrial. The upper and mid catchment area is largely medium density residential. The lower catchment includes a range of commercial and industrial areas, separated from Orphan School Creek by an open space corridor. #Study Objectives Key objectives of this study are: * 1) To test the sensitivity of overland flood modelling using different assumptions of the capacity of the existing stormwater drainage system. It will compare the drainage system at different levels of detail, and evaluate the benefit provided by increasingly detailed models. Conclusions from this study will establish the methodology of subsequent studies for the remainder of the LGA catchments * 2) To identify the major overland flow paths within the Canley Corridor catchment study area. The study area is detailed in Section 2.4 and includes parts of sub-catchments 13, 14, 15 and 16 as identified in the preliminary city-wide Overland Flood Study (SKM, 2004). The Canley Corridor study area is shown in Figure 1-1. Other objectives of the study are to: * Identify properties at risk of local overland flooding * Assess provisional flood hazard to identified properties due to local overland flooding for the 1% AEP (Annual Exceedance Probability) and the PMF (Probable Maximum Flood) * Carry out field verification of identified overland flow paths at selected locations * Prepare flood extent and flood risk precinct maps for the study area for the 1% AEP and PMF events * Produce flood results (flood level, velocity and flow) for the 5, 20, 100 ARI year and PMF events #Conclusions #Hydrologic Modelling Methodology Comparison of the different hydrologic models indicates that while detailed modelling provides a more precise picture of flooding, this would not necessarily translate into a different assessment of flood risk, or in significantly different planning controls being applied. All three hydrologic modelling approaches (Detailed DRAINS, Limited DRAINS and RAFTS) resulted in similar high flood risk areas being identified along the main overland flow paths, and reproduced the known historical ‘trouble spots’ within the catchment. However the simpler models tended to overestimate flood risk due to coarser representation of flow travel times and artificial concentration of flows at fewer inflow boundaries. Production of a detailed DRAINS model including all pits and pipes in the catchment was estimated to be four to five times more expensive than production of a limited DRAINS model, and approximately