Eastwood & Terrys Creek Floodplain Risk Management Study & Plan Main Report
Published by Ryde City Council
About this dataset
#Reasons for the Study and Plan Flooding problems within the Eastwood town centre and other areas within the Terry’s Creek catchment are well documented. Significant flooding problems have been experienced in 1967, 1984 and 1989. It is estimated that over 70 houses or commercial properties experienced above floor flooding in the November 1984 flood. A range of flood mitigation options were investigated some 17 years ago, in the Terry’s Creek Catchment Management Study that was prepared for the Water Board. Since that time, there have been a number of other studies with an emphasis largely on structural options, including tunnelling, as a means of reducing Eastwood’s flood problem. There have also been various planning initiatives undertaken by Council which have imposed restrictions on development because of the flood problems. In May 2006, Bewsher Consulting was commissioned by the City of Ryde to assist its Floodplain Management Committee in preparing a Floodplain Management Study and Plan for Eastwood and Terry’s Creek. #Responsibilities The prime responsibility for planning and management of flood prone lands in NSW rests with local government. The NSW Government provides assistance on state-wide policy issues and technical support. Financial assistance is also provided to undertake flood and floodplain risk management studies and for the implementation of works identified in any subsequent floodplain risk management plan. The Eastwood and Terry’s Creek Floodplain Management Committee oversaw the Study. This committee includes Councillors and staff from the City of Ryde, and staff from Parramatta City Council, Hornsby Shire Council, Department of Environment, Climate Change and Water (DECCW), Sydney Water Corporation and the State Emergency Service (SES). A number of community representatives were also represented on the committee. #The Study Area The study area, shown on Figure 1, includes that portion of Terry’s Creek within the City of Ryde, from Terry Road to the creek’s confluence with the Lane Cove River. The Eastwood town centre is located within the study area, and straddles the Main Northern Railway Line. In addition to the main creek, the study area includes all significant tributaries and many overland flow paths. Some consideration has also been given to works that have previously been recommended within Parramatta City Council, where these works potentially impact on flooding within the City of Ryde. The potential for flooding of properties in Parramatta City Council and Hornsby Shire Council has also been considered immediately upstream and downstream of the railway crossing. #Reporting The Study results have been presented in a number of reports as the study has progressed, including reports covering: * the Flood Study (May 2008); * Town Planning Considerations (July 2008); and the * Floodplain Risk Management Study and Plan (this report). Consultation Community consultation has been an important component of the project. Key elements of the consultation process have been as follows: * regular meetings of the Eastwood & Terry’s Creek Floodplain Management Committee; * public review of the flood study results, including a public display during July and August 2007, an information day and feedback process; and * public exhibition of the draft floodplain risk management study and plan, prior to formal consideration by Council. #Modelling of Flood Behaviour Flood behaviour has been assessed using computer models. The catchment area and stormwater pipe network within the study area was modelled using the DRAINS hydrologic model. Catchment flows from the Parramatta and Hornsby Council portion of the catchment were generated using a less detailed RAFTS model. Flows from these models were input to a two dimensional TUFLOW hydraulic model to estimate flood depths and the extent of flood inundation. The flood models were calibrated to the November 1984 flood. They were then used to simulate flood behaviour for a range