Skip to content
Open Data Finder
California Open Data

DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024

Published by California Energy Commission

About this dataset

Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corridor. A data dictionary is available at https://afdc.energy.gov/data_download/alt_fuel_stations_format.

DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024 · Open Data Finder